![Overload Protection Retrofit](https://www.machiii.com/wp-content/uploads/2020/06/ASSY-ARM-RETROFIT-300x100.png)
A positioning arm that held a panel in place as it was attached to the wing assembly of an aircraft was already in use when a problem was discovered. Overload placed on the panel was traveling through the drive train to the motor. Thinking outside the box, Mach III’s engineering team devised a solution that fit within the existing drive system.